Digital Approvals for Clearer Countertop Project Handoffs
Keep the customer’s decision connected to the correct design, quote revision, and next step.
Updated October 4, 2026

Be clear about what is being approved
A customer may be agreeing to a price, a material choice, a drawing, or a production detail. Those decisions do not always happen at the same time. Name the scope of each approval so the customer and the shop understand its purpose.
The proposal should identify the relevant revision, included work, assumptions, and any decisions that remain open.
Make the review easy to follow
Put the information needed for the decision together. A visual layout can explain the design while line items and notes establish what is included. Give the customer a clear next action and a way to raise a question.
Check the experience on a phone as well as a desktop. Customers should be able to review the important details without navigating unrelated information.
Keep changes visible
A changed material or design can require a new review. Establish who updates the quote, how the new revision is identified, and when an earlier approval no longer covers the current scope.
Keep records of the accepted version accessible to the people who need them. The goal is a reliable handoff between the sales conversation and the work that follows.
Match the process to your requirements
Approval records, electronic signatures, contracts, and payment authorization serve different purposes. Confirm the capabilities and recordkeeping your business requires instead of treating every online interaction as interchangeable.
Have the appropriate advisers review your contract and signature requirements. Software configuration should follow the process your business has decided to use.
Test the entire handoff
Use a sample job to walk through sending a quote, asking a question, revising the scope, and recording a decision. Then show the result to the team that schedules and produces the work.
In a 2cm demo, review the customer portal and approval workflow alongside your existing documents and handoff requirements.
Check the scope attached to the approval
Before acting on an approval, compare the material, drawing, itemized price, and scope with the version the customer reviewed. If a sink or edge detail changes afterward, resolve that change before sending the job into fabrication. Keep a record of what was agreed and when.
This is an operational checklist, not a statement about the legal effect of a particular signature. In 2cm’s customer quote workflow, the proposal and approval step are connected. Pair that review with the job’s tasks and documents so the team can find the agreed scope.